AMBAR Identidad Técnica y Comercial, S.L.
Normativa

Machinery Regulation (EU) 2023/1230: what changes on the rating plate

From 20 January 2027, Regulation (EU) 2023/1230 replaces the Machinery Directive. What data the machine must carry, what is new and what to review on the plate.

  • Lectura · 6 min
  • Normativa

What changes and when

Regulation (EU) 2023/1230 on machinery replaces Directive 2006/42/EC. It was published in the Official Journal of the European Union on 29 June 2023, entered into force on 19 July 2023 and applies from 20 January 2027. As a regulation, it applies directly in every Member State, with no national transposition.

For machinery manufacturers, the rating plate remains the physical carrier of the marking. What changes is part of the information that must accompany it, and a clearer definition of who is responsible for it: manufacturer, authorised representative, importer or whoever modifies the machine.

Data the machine must carry

Annex III of the regulation keeps the requirement for visible, legible and indelible marking. As a minimum it must include:

  • Business name and full address of the manufacturer and, where applicable, of its authorised representative.
  • Designation of the machinery.
  • CE marking.
  • Designation of series or type.
  • Serial number, if any.
  • Year of construction, that is, the year in which the manufacturing process is completed.

As under the directive, this is completed by the information essential for safe use that is relevant to the type of machine, such as mass or power, and by any data required by other applicable legislation (low voltage, pressure equipment, explosive atmospheres).

What is new: digital contact, importer and instructions

Article 10 requires the manufacturer to indicate its name, registered trade name or registered trade mark and postal address, and adds the website and an email address or other digital contact. This information goes on the machine itself or, where that is not possible, on its packaging or in an accompanying document. The importer of a machine built outside the Union must identify itself in the same way.

Instructions may be supplied in digital form. In that case the machine, its packaging or an accompanying document must state how to access them, and the purchaser may request a paper copy free of charge at the time of purchase. This is why many manufacturers are now reserving space on the plate for a QR or DataMatrix code that leads to the documentation.

Article 18 also clarifies a common shop-floor case: whoever carries out a substantial modification of a machine is considered its manufacturer, with the same conformity assessment and marking obligations.

What to review on the plate before 2027

  • That the plate, or a marking next to it, includes the website and contact email as well as the postal address.
  • If instructions will be digital, space for the code or access address, large enough to remain readable throughout the life of the machine.
  • On imported machines, the importer's details.
  • The variable fields for each unit: type, serial number and year of construction.
  • That the material and marking process withstand the real working environment: cleaning, oils, weathering, abrasion.

Material and process: a plate that lasts as long as the machine

The regulation does not prescribe materials: it requires a result. A plate that is illegible after five years is as non-compliant as a missing one. In practice, anodised aluminium with the image sealed inside the anodic layer covers most indoor and outdoor applications; laser-marked stainless steel is used for chemical environments, frequent wash-down or high temperature; and the variable data for each unit are fibre-laser marked onto the finished plate.

At AMBAR ITC we manufacture the plate to the drawing and data supplied by the machine manufacturer, who assesses conformity and is responsible for the CE marking. This guide summarises the points of the regulation that affect marking and does not replace the official text published in the Official Journal of the European Union.

FAQ

Preguntas frecuentes

Las dudas más habituales que recibimos sobre este tema.

Does your project need certified industrial identification?

The AMBAR ITC technical team will review your specification and reply with a detailed proposal within 24-48 working hours.